How to Prepare Your Home for New Flooring Installation

How to Prepare Your Home for New Flooring Installation

By Sean Henry, Owner of Floor Concepts · Updated November 5, 2026

Picture this. The installers pull up at 8 a.m. The new flooring is ready to go. And the living room is still full of furniture, the TV is mounted over a pile of cables, and the dog is very excited to meet everyone.

It happens more than you'd think, and it slows everything down.

Short Answer: To prepare for new flooring, plan around your lead time first. In-stock materials can be installed in a few days, while ordered materials usually take 2 to 3 weeks. Then, before installation day, clear the rooms of furniture and breakables, empty closets if they're getting new floors, plan for pets and kids, and make room for the crew and materials to get in. Your installer handles the floor itself.

At Floor Concepts, we've been installing floors in Wilmington-area homes since 1982. These are the steps that make installation day go smoothly.


Step 1: Know Your Timeline

  • In-stock carpet, remnants and select products: installation can be just a couple of days away.
  • Ordered materials: allow about 1 week to 10 days for the material to arrive, or about 2 to 3 weeks total to installation.
  • How long the install takes: most LVP and carpet installs take one or two days, even for a few rooms or an entire floor. Tile usually takes 2 to 5 days.

If you're working toward a date, like a holiday, a move or a new baby, tell us early. Making color and timing decisions before you buy helps a lot. See Flooring Color, Timing, and Delivery: What You Must Decide Before Buying.


Step 2: Clear the Rooms

  • Remove small furniture, rugs, lamps and anything on the floor.
  • Empty closets that are getting new flooring.
  • Take fragile items off shelves and walls in the work area. Installation can cause vibration.
  • Unplug and move electronics, and label the cables so setup is easy afterward.

Large furniture: Our crews can move furniture for an additional cost. They don't move specialty items like pianos, aquariums, pool tables, electronics or large adjustable beds, so plan to have those moved before installation day.

Tip: Take a quick photo of how your TV and computer cables are connected before you unplug anything.


Step 3: Plan for the Old Floor

In most projects, the old flooring comes up first. Removing and disposing of your old floor is an additional cost. We'll go over it during your estimate, and it's itemized on your invoice.

Sometimes we find surprises once the old floor is up, like a soft spot, an uneven subfloor or old water damage. If that happens, we'll show you, explain the options and the cost, and let you decide before we go further.

We test for moisture when there's a reason to, like visible signs or something you've told us, so mention any past leaks or damp spots before installation day.


Step 4: Plan for Bathrooms, Appliances and Doors

  • Toilets and appliances: Our crews remove and reset toilets and appliances, such as the refrigerator, dishwasher, or washer and dryer, as part of the job.
  • Doors: New flooring can be taller than the old floor, so some doors may need to be trimmed to swing freely.
  • Trim: We usually install new quarter round and trim unless you ask us not to. It's cleaner and more efficient than removing and reusing the old pieces.

One thing to know: our installers aren't plumbers or appliance repair technicians. If they find something unusual, like a broken toilet flange or a leaking water line, they'll stop and let you know the next steps. Occasionally that means calling in a plumber, contractor or repair person, but that's the exception.


Step 5: Plan for Pets, Kids and Daily Life

  • Keep pets in another room or with a friend for the day. Doors will be open, and tools will be everywhere.
  • Plan where the kids will play.
  • Expect the work area to be off-limits while the crew is working, and sometimes overnight.
  • For refinishing or tile, plan for drying and curing time before you walk on the floor or move furniture back.

Step 6: Make Room for the Crew and Materials

  • Clear a path from the driveway to the work area.
  • Leave parking space close to the door for the crew's truck.
  • Make sure there's power and good lighting in the work area.
  • Set your thermostat to a normal living temperature. Many floors need a steady temperature before, during and after installation. Some products also need to sit in your home for a set time before they're installed. Your installer will follow the manufacturer's instructions.
A professional installer laying luxury vinyl plank (LVP) flooring in a living room next to a stack of flooring materials and an exposed subfloor.

Sometimes DIY Prep Makes Sense, and Sometimes It Doesn't

You can save time by doing the easy prep yourself: clearing small items, emptying closets and planning around pets. Heavy furniture, appliances and anything involving plumbing are better left to the pros. A dropped dresser or a leaking water line costs far more than the help would have.


Your Flooring Installation Prep Checklist

  • ✓ Confirm the install date and arrival time, and who will let the crew in
  • ✓ Remove small furniture, rugs and breakables
  • ✓ Empty closets getting new floors
  • ✓ Unplug electronics and photograph cable setups
  • ✓ Confirm who moves large furniture and appliances
  • ✓ Mention any past leaks, damp spots or soft floors
  • ✓ Plan for pets and kids
  • ✓ Clear a path and parking for the crew
  • ✓ Keep the home at a normal temperature
  • ✓ Ask how long until you can walk on the floors and move furniture back

The Bottom Line

Good prep doesn't take long.

It just has to happen before the truck pulls up.


Questions Before Installation Day?

We're happy to walk you through it. If you're still choosing a floor, schedule an in-home estimate. If you've already bought from us, call the showroom at 302-994-5002 with any questions before your install. For mistakes to avoid, read 7 Flooring Installation Mistakes to Avoid.


Frequently Asked Questions

Do I need to be home during flooring installation?

Not for the whole job. Someone needs to meet the installers at the door, or you can arrange ahead of time for them to let themselves in.

How long does flooring installation take?

Most LVP and carpet installs take one or two days, even for several rooms or a whole floor. Tile typically takes 2 to 5 days, and hardwood refinishing typically takes 3 to 5 days. We'll give you a timeline before work starts.

Do I need to remove my old flooring?

No. Our crews remove and dispose of it for you. It's an additional cost that we discuss during your estimate and list on your invoice.

How soon can I walk on my new floors?

Carpet and LVP can usually be walked on right away. Tile and refinished hardwood need drying and curing time. Your crew will tell you exactly when.

Will installation be dusty?

There's some dust with any installation, especially when old flooring is removed. For refinishing, we use dust-controlled sanding to keep dust to a minimum.


Keep Reading


Floor Concepts has served Wilmington, Greenville, Hockessin, Newark, Middletown, Bear, Avondale, New Castle, Kennett Square, Landenberg, Smyrna, Dover, and the surrounding areas for over 40 years. Every installation we do is backed by our Lifetime Installation Warranty.

Floor Concepts
4315 Kirkwood Highway
Wilmington, DE 19808
(302) 279-5940

Return to main blog page

Ready for Real Numbers?

Get a price range for your rooms in two minutes, or compare samples at our Kirkwood Highway showroom.

Get an Instant Price Book a Showroom Visit

More about installation: Professional Flooring Installation

Contact Us

Name
Contact

Thank You For Contacting Us.

Thank you for contacting Carpet One Floor & Home. Your local flooring expert will reach out to you regarding your inquiry.

 

 

Call: 302-994-5002